Digital Handover

Validate handover package completeness and readiness for operational transition

Handover Readiness
86%

Complete

19 of 22 items complete

Asset Completeness

HVAC Equipment Inventory

All air handling units, VAV boxes, and terminal units documented.

Electrical Equipment

Main panels, circuit breakers, and distribution equipment verified.

Plumbing Systems

3 assets missing warranty documents. AHU-04 chilled water loop requires final inspection.

Building Envelope Systems

Windows, doors, and insulation specifications complete.

COBie Delivery

COBie Spreadsheet

Excel file with asset, equipment, and system information.

Commissioning Reports

HVAC Commissioning Report

Commissioning report pending for AHU-04. Awaiting final balancing.

Building Controls Commissioning

BACnet integration and controller startup verified.

Digital Signatures

Contractor Sign-Off

General contractor has digitally signed completion certificate.

Design Professional Verification

Architect and engineers have verified system compliance.

Documentation

System Design Drawings

AutoCAD and Revit files delivered for all systems.

As-Built Plans

All floors updated with installed configuration.

Equipment Datasheets

Manufacturer specification sheets compiled for all major components.

O&M Manuals

HVAC Operation Manual

Complete operating and maintenance procedures for climate control.

Electrical System Manual

Pending final review by facility management.

Plumbing Maintenance Guide

Valve maintenance, drain locations, and emergency procedures included.

Test Certificates

HVAC System Performance Testing

Air balancing and thermal load verification completed.

Electrical Load Testing

Circuit continuity and ground resistance verified.

Pressure Testing (Plumbing)

All piping tested at 1.5x operating pressure.

Training Documents

Facility Staff Training

Training sessions completed with O&M documentation provided.

Building Automation System Training

Control system operation and troubleshooting training delivered.

Warranty

Equipment Warranties

Warranty documents for HVAC, electrical, and plumbing equipment.

Installation Workmanship Warranty

1-year workmanship warranty from general contractor.

Digital Handover Certificate
Preview of the certificate that will be issued upon acceptance

Certificate of Digital Handover

Airport Terminal T2

T2_MEP.ifc Model

Certificate Number:DHC-PROJ-MODE-2026
Date of Issuance:August 5, 2026
Readiness:86% Complete

This digital certificate confirms that all handover requirements have been met and the building systems are ready for operational transition.